Well flooring won't be going into my bedroom today. There's a high spot in the sub flooring. Almost an inch variance to the rest of the floor and in a high traffic spot. They can't install with that much difference in level. :( And as installers they can't do structural work such as rip up and lay down new subflooring.
I have a call into Raheem and Sherin. It sounds like the front room has the same issue. Shit.
All of this for nothing.
And now, I can't have anything done until I return mid March.
I have a call into Raheem and Sherin. It sounds like the front room has the same issue. Shit.
All of this for nothing.
And now, I can't have anything done until I return mid March.